Hydraulic pipe prefabrication

Tube processing machines and pipeline fittings, built for shops that assemble hydraulic lines

XYOON makes ferrule pre-assembly machines, tube end forming equipment, pipe benders and a full fittings line. Two product lines, one supplier: the machine that prepares the tube and the fittings that seal it. Supplied direct from the Ningbo plant to factories and hydraulic distributors.

Send your tube spec See all products

Tube preparation equipment

Ferrule pre-assembly machine

Presses the ferrule onto the tube end before the fitting is assembled. Replaces hand seating, so the seating depth is set by the machine rather than by operator feel.

  • Manual and electric variants
  • Repeatable seating depth across a batch
  • Shorter cycle per joint than hand assembly

Tube end forming machine

Reshapes the tube end by radial extrusion under hydraulic pressure: flaring, expanding, necking and beading on one unit with interchangeable clamping dies and ejector tools.

  • Radial extrusion, not hammering
  • Four end forms with die change
  • Prepares ends for flare nuts, flanges and clamps

Memory pipe bending machine

Stores multi-angle parameter sets and repeats them, with a deformation-prevention structure and foot control. Aimed at small and mid-size tube workshops that switch between runs.

  • 6–42 mm steel tube
  • Stored angle programs
  • Deformation-prevention structure

Steel pipe deburring machine

Removes burrs, flash, sharp edges, weld slag and oxide from the inner wall, outer wall and end face after cutting, welding or stamping, so the surface is consistent before assembly.

  • Inner, outer and end-face treatment
  • Replaces manual filing
  • Feeds the assembly stage

Tube cutting machine

Cold saw cutting of tube to length with a burr-free cut face, the first step of the tube preparation chain.

  • Cold saw cutting
  • Burr-free cut face
  • Feeds deburring and forming

PTFE tape winding machine

Winds thread sealing tape to a consistent tension and overlap, replacing manual winding in accessory workshops.

  • Consistent tension per cycle
  • Less tape waste
  • For hydraulic accessory and valve workshops

Steel tube spinning flaring machine

Spinning forming of tube ends where the wall is thinned and flared by roller action rather than by press.

  • Roller spinning flaring
  • Suited to thin-wall tube
  • Complements the extrusion forming range

Metal sawing equipment

Band saw cutting for bar and tube where a portable or floor unit is needed before machining.

  • Portable and floor units
  • Bar and tube
  • Cuts ahead of forming

Fittings that close the joint

Hydraulic ferrule

Cutting-ring ferrules in carbon steel, 304 and 316 stainless, matched to tube material and wall thickness.

Hydraulic fitting

Straight, angle and tee bodies including F37 valve block configurations and EO-2 functional nuts for pre-assembled lines.

SAE 37° flare flange

Flare-flange connections that mate with 37° flared tube ends produced on the KC-WF42 forming machine.

Hydraulic sleeve

Sleeves in 316 and 304 stainless plus carbon steel, sized to the ferrule and the tube outside diameter.

Functional nut (EO-2 style)

DOZ, FORM, HO2 and FM functional nuts for pre-assembled hydraulic lines, with the dimensional tables from the current data sheets.

Ball plug

KC, KCQD, KCS and KCV ball plug series covering metric and inch bore sizes.

Metric bolt and 5T fittings

700M metric bolt program and the 5T fitting family, with thread and dimensional data from the parameter sheets.

Where these components end up

Tubes prepared on XYOON equipment and sealed with XYOON fittings are used in road transport, aerospace ground equipment, marine systems, rail transit, industrial machinery. The work splits the same way everywhere: cut, deburr, bend or form, pre-assemble the ferrule, then pressure test.

Certification — what the certificates actually say

CE verification of conformity (voluntary VOC, not an EU Declaration of Conformity)ICR/VC/HS240604 · ICR Co. Ltd(证书页 www.icrqa.com / [email protected],CEO 签字) · valid to 2029-06-03(Expiration date 03.06.2029;Issue date 04.06.2024)

Read the certificate page for the exact scope wording. The CE document held here is a voluntary verification of conformity issued for one machine model, not an EU Declaration of Conformity. Quote it as verification evidence, not as "CE certified".

Buying terms

  • MOQ: 1 unit
  • Lead time: 1–3 weeks
  • Incoterms: EXW / FOB / CIF
  • Payment: T/T

Send the tube spec, get the machine and fitting matched

Tell us tube OD, wall thickness, material, end form and target cycle time. We reply with the model, the dies needed and the lead time.

Request a quote